YN 18850 Project Triton, a 50m steel yacht is currently under construction at the HessenYachts shipyard in Oss. CliffordDenn and Reymond Langton have designed the project. The photographer captured the moment when one of the key stages of the project was reached - the connection of hull and superstructure, which was lifted with a crane.
The finished Triton will be delivered in March 2020. The 500 ton yacht will be powered by two MTU 8V4000 M63 diesel engines, each rated at 1000 kW. At cruising speed of 12 knots, the boat will be able to cross oceans without refueling. The cost of the project is estimated at $37.6 million.